Branz Internal Gutter
When sizing an internal gutter the gutter should be divided into sections each section is the length of gutter between the downpipe and the high point on one side of the downpipe.
Branz internal gutter. Internal gutter construction gutter construction varied from a simple shallow trough or v like a valley detail to a tapered valley laid over firred framing to give a fall figures 5 and 6. Gutters and downpipes are the most common method of disposing of surface water from buildings. However significant inconvenience damage repair cost and health issues may occur if water from the gutter gets into the building structure and or the space below. Statutory requirements rainfall.
Ongoing maintenance of internal gutters is as essential as good design and. Figure 1 internal gutter design. Often the outlet to the valley gutter discharged over a small portion of roof before being contained by the eaves gutter figure 7. Can be purchased for 13 50 from www branz co nz or call 0800 80 80 85.
Design for a 10 minute rainfall intensity for the location with a recommended minimum design intensity of 200 mm hour rainfall intensity is for a storm with a 10 probability of occurring annually. Branz search and locate tool the branz digital helpline a useful directory of building and construction information in new zealand. Outlets need to be protected from blockage. Sections are sized according to the roof catchment and the largest calculated size is used for the whole gutter.
Every internal gutter must have at least one outlet and one overflow. Internal gutters also known as box gutters are seen as an easy solution to the collection and disposal of roof water. Building and construction professionals can also call the branz helpline 0800 80 80 85 for advice. My house is a 2 story california split style though i live north of seattle ha and has exposed rafter ends about 20 inches or half a meter long supporting the exposed and painted plywood decking with an angle cut on the exposed rafter ends.
Live in the us and houses built in the 70s have this internal gutter system that s failing all over the neighborhood. Checked annually for any damage or deterioration to the gutter lining cleared to remove debris leaves etc. E2 as1 specifies no end laps for membrane lined internal gutters and that metal gutter laps are welded. Where the gutter discharges into an outlet pipe it must be a minimum diameter of 75 mm and sized to suit the overall gutter capacity.
Consumers can call the consumer helpline 0900 5 90 90 calls cost 1 99 per minute plus gst. To ensure that water is safely disposed of gutters and downpipes should be sized and installed so that the expected amount of water can be controlled with minimal chance of water entering the building and minimal risk of uncontrolled spillage this bulletin covers.